We Awarded the Tender for the Replacement of The Kranji Water Reclamation Plant in Singapore
We Awarded the Tender for the Replacement of The Kranji Water Reclamation Plant in Singapore
Ecomembrane will be closed from December 24th to January 6th 2020.
Our offices will open on Tuesday 7th.
Best wishes to all of you!
CUPOLA M2 D.28m
Location: Astakos
Ecomembrane will be closed from August 12th to 16th.
Our office will open on Monday 19th.
Enjoy your summer!
2MASTER Gasholder – 2100m3
Location: Bau at Kuching Sawarak
N.3 Cupola M2 D.20m
Location: Hongsung Biogas Plant
CUPOLA M2® 2-membrane gasholder dome 23m
Location: Hap Seng - Lahad Datu, Sabah
N.6 Cupola M2 D.29m and 32m
Location: Polatli
N.2 2MASTER Gasholder 3000m3
Location: Timokhovo Biogas Plant
2MASTER® 2-membrane gasholder 1.100m3
Location: Sorpa - Alfsnes WWTP, Reykjavik
Ecomembrane sostiene l'iniziativa "COMPRIAMO ITALIANO" presente a pagina 22 del Corriere della Sera 29/03/2020
Scarica il Corriere Della Sera: DOWNLOAD
2MASTER Gasholder 8.450m3
Location: Sakarya Landfill
3MASTER® 3-membrane gasholder 1.200m3
Project: LATTERIA BIZIOS S.A.
N.6 Cupola M2 D.40m
Location: Farsø
N.2 CUPOLA M2 D.37m for the first LIQUEFIED BIOMETHANE PLANT with CO2 recovery in Italy
Location: Cooperativa Speranza – Candiolo (TO)
2MASTER Gasholder - 10.000m3
Location: Harmandali Landfill - IZMIR
N.1 CLARICOVER® rectangular shape 28m x 11m
&
N.1 CLARICOVER® diameter 13m
Location: STP Palomonte (SA)
2MASTER® 2-membrane gasholder 1/2 sphere 16.000m3
Location: Seymen Landfill
2MASTER Gasholder - 2.640m3
Location: WWTP PLZEN
M1 CONE diameter 23m
Location: Az Agr. Barra - Racconigi (CN)
2MASTER® 2-membrane gasholder 3/4 sphere 8.450m3
Location: Odemis Biogas Plant